Encamp · Andorra

Under development

Nanta Alta

A private collection of 25 mountain villas in Els Cortals d'Encamp, defined by privacy, comfort and mountain grandeur.

Home Projects Nanta Alta
Project value
€50M
Number of units
25 villas
Total area
8,733 m² built
Est. completion
Q4 2027

About this project

Project Overview

Nanta Alta is a collection of 25 detached mountain villas in Els Cortals d'Encamp, at 1,250 m by the Riu de les Agols, about 7 km from Andorra la Vella. Each villa follows the natural slope over three levels: a garden level with the bedrooms, a living level with double-height glazing, and an entrance level with a double garage. Villas of 297–315 m² offer up to four bedrooms, with a natural stone façade, timber-look panels, pitched slate roofs and an aerothermal heat pump with underfloor heating. The development is released in two phases: 8 villas now, 17 to follow.

Why invest

The Investment Case

Buildable land in Andorra is scarce, and detached new-build homes in a protected mountain setting close to Andorra la Vella are rarer still. Nanta Alta answers that demand with a limited release: Phase 1 opened for reservations in September 2026 at Early Bird prices from €1,895,000, with one villa already reserved. The project is designed by DATA Arquitectes and delivered with an established Andorran team, from Hormipresa's industrialised structure to Construccions Pujal for construction and finishes.

Key features

Project Highlights

  • 25 villas in two phases: 8 villas in Phase 1, 17 in Phase 2
  • 297–315 m² over three levels, up to 4 bedrooms
  • Double garage in every villa, included in the price
  • 1,250 m altitude in Els Cortals d'Encamp, about 7 km from Andorra la Vella
  • Natural stone façade, slate roofs and full-height glazing
  • Aerothermal heat pump with underfloor heating, designed for the highest energy rating

Timeline

Development Milestones

Preliminary design (DATA Arquitectes)

Feb 2026

Phase 1 reservations open

Sep 2026

Building licence & purchase contracts

Q4 2026

Construction start

Q1 2027

Phase 1 completion & move-in

Q4 2027

Phase 2 release (17 villas)

To be announced

Delivery team

Project Partners

The companies we have partnered with to design, build and deliver this development.

Dates and figures are indicative and may change as the project progresses. Images are illustrative and non-contractual. Promoted by VG Equity Partners, S.L.

Manage preferences

Essential cookies

Always on

Needed for the site to work and stay secure. These cannot be switched off.

Analytics cookies

Google Analytics statistics, and a record of the pages and buttons you use here. If you contact us, that record is added to your enquiry so we can help you better.

Marketing cookies

Let us measure how our advertising performs and reach people who have shown an interest, through Meta.