Ordino · Andorra

Under development

Ordino Prestige

37 homes across three stone-and-timber buildings, terraced above Ordino on the Coll d'Ordino.

Home Projects Ordino Prestige
Project value
€32M
Number of units
37 homes
Total area
8,161 m² built
Est. completion
2028

About this project

Project Overview

Ordino Prestige is a limited collection of 37 homes in three low-rise buildings (Aire, Brisa and Calma), set around a private community garden on the Coll d'Ordino at about 1,300 m, a short walk from the village centre and 8 km from Andorra la Vella. Designed by DATA Arquitectes in natural stone and timber, the homes range from 2 to 4 bedrooms, with garden terraces on the ground floor and corner balconies above. Two shared basement levels hold 76 parking spaces, 37 storage rooms and the Club Ordino Prestige amenities: a spa with indoor pool, a gym and a meeting and work room.

Why invest

The Investment Case

Ordino is Andorra's most supply-constrained parish, and new planning rules limit most zones to two storeys, which makes a well-located new development of this scale hard to replicate. Early Bird pre-sales opened in September 2026 at €7,750 per m² built, below the €35.8M independent valuation of August 2026, and five homes are already sold or reserved. The project is delivered by an established Andorran team, with construction by Construccions Pujal.

Key features

Project Highlights

  • 37 homes in three buildings (Aire, Brisa, Calma) around a private community garden
  • 2-, 3- and 4-bedroom homes; Early Bird prices from €443,998
  • Club Ordino Prestige: spa with indoor pool, gym and meeting and work room
  • 76 underground parking spaces and 37 storage rooms, sold separately
  • About 1,300 m on the Coll d'Ordino, in a UNESCO Biosphere Reserve parish
  • Stone and timber architecture by DATA Arquitectes, triple glazing and aerothermal underfloor heating

Timeline

Development Milestones

Administrative closing & technical contracting

Q3 2026

Early Bird pre-sales

Q3–Q4 2026

Building licence (three parcel licences)

Autumn 2026

Construction start

Jan 2027

Structure, façades & finishes

2027–2028

Handover & deeds

2028

Delivery team

Project Partners

The companies we have partnered with to design, build and deliver this development.

Dates and figures are indicative and may change as the project progresses. Images are illustrative and non-contractual; shared-space renders are conceptual. Promoted by VG Equity Partners, S.L.

Manage preferences

Essential cookies

Always on

Needed for the site to work and stay secure. These cannot be switched off.

Analytics cookies

Google Analytics statistics, and a record of the pages and buttons you use here. If you contact us, that record is added to your enquiry so we can help you better.

Marketing cookies

Let us measure how our advertising performs and reach people who have shown an interest, through Meta.